Workshop 6 major waste
Category:Industry news Source:This station Datetime:2023-09-06 09:04:00 Hits:268
Workshop 6 big waste

Waste of time, waste of waiting, waste of action, waste of materials, waste of defective products, waste of handling.

1. Waste of time

Meal time staff arrangement is unreasonable or show on time to work, resulting in waiting for or out of work. The work content is not clear after work, indicating that it can enter the work state in time. The basic anomaly processing time of the post is too long, the common equipment alarm will not be solved, and the delay time is too long.

Requirements after improvement:

According to the status of the position fully arrange the staff to eat, according to the prescribed time to work. Quickly enter the working state after arriving at work, such as doing a good handover, doing a good job of process hygiene, checking products in process, pasting table paper, etc. Be familiar with the adjustment of post related printing parameters, and be able to solve the printing problems and common alarm information correctly and timely.

2. Waste of waiting

The production of raw materials is not confirmed before use, resulting in production interruption. Improper production planning and insufficient reservation of products in process caused the interruption of production in the next track.

Requirements after improvement:

And check the raw materials required for production to ensure sufficient production. Can reasonably control the amount of products in process according to the production schedule to ensure uninterrupted production.

3. Movement waste

The items are not placed in the designated position according to the regulations, and can not be found when using. The location of the object is not reasonable, which increases the extra work.

Requirements after improvement:

Post public goods fixed position, after use, put back in time.

Make reasonable position planning for the post, reduce the unnecessary action in production and waste time.

4. Waste of O-ring materials

The material is not fully used, and the surplus is too much. Failure to follow the rules of use during the use of items leads to early obsolescence. Items are not taken care of during use leading to waste. Items are not subject to mandatory control, resulting in insufficient or over-claimed use.

Requirements after improvement:

In the case of ensuring production, make full use of materials as far as possible to avoid excessive surplus waste.

Follow the rules of use during the use of items to increase the service life of items.

Use and take good care of the items during use.

Strict control of the amount of items.

5. Waste of defective products

In manufacturing, we will have some defective products, although the manufacturing environment is strict, we should try to exclude various environments.

Requirements after improvement:

Control the amount of rework, reduce scrap and eliminate differences; Check the product timely after the mold.

6. Waste of handling

The number of carrying moves is large and the position is far away. Excessive transportation occupies large storage space. Too much handling, inventory time waste time.

Improved requirements:

Minimize the location and frequency of handling. According to the production situation, according to the quantity.